Install
Please confirm you are human
This browser or connection looks automated. Press and continuously hold the control for 3 seconds to enable Google-hosted web results and, when separately allowed, AI-assisted answers.
A successful check enables 100 search requests. Interactive access does not authorize scraping, systematic collection, or reuse of search output.
News
Pavers sink on Nasiya Road within a week: Potholes up to 3 feet deep as Chhawani traffic adds to commuters’ woes - Indore News
5+ day, 13+ hour ago (426+ words) Several stretches of Nasiya Road in Indore have sunk after rain, just a week after pavers were installed following drainage work. In some places, the road surface has caved in, while the pavers have become uneven at others. Traders said…...
Gurugram: 10-foot sinkhole forms at Iffco Chowk after sewer line collapses
2+ week, 5+ day ago (426+ words) New Delhi: A large sinkhole formed on the service road near Iffco Chowk in Gurugram after a master sewer line collapsed on Tuesday, officials said. The road caved in a day after heavy rain caused widespread waterlogging and traffic congestion…...
Service road near Iffco Chowk caves in after sewer line collapses
2+ week, 5+ day ago (448+ words) A large sinkhole was formed on the service road at Iffco Chowk after a master sewer line collapsed on Tuesday, officials said. According to officials, the road cave-in occurred after a dilapidated sewer line managed by the Gurugram Metropolitan Development…...
Gurgaon chaos continues: Massive sinkhole swallows service road on Delhi-Jaipur highway
2+ week, 6+ day ago (945+ words) The Times of India...
Rs 40 Crore Indore Smart City Road Cracks During Pipeline Testing, Raises Quality Concerns
3+ week, 6+ day ago (235+ words) Published: August 18, 2026 at 8:34 PM IST Indore: A water pipeline burst beneath a road constructed under the Smart City project in Indore during testing on Monday. The incident has raised concerns over the quality of the infrastructure work. The incident occurred…...
Indore road ruptures during high-pressure water pipeline testing | Indore News
3+ week, 6+ day ago (306+ words) Indore road ruptures during high-pressure water pipeline testing The Times of India INDORE: High-pressure testing of a newly laid 24-hour water supply pipeline caused a portion of Gorakund Road to rupture The pressure burst through the surface, dislodging paver blocks…...